[Enter the power capacity of the BESS Project in Mega Watts.]
[Enter the energy capacity of the BESS Project in Mega Watt Hours.]
[Enter Capex of the BESS Project (in Rs/Dollar/Currency of Choice/MWh). Maintain currency consistency throughout this form.]
[The useful life of a BESS project. e.g., 15 for 15 years.]
[Enter estimated salvage value as a percentage of the total Capital Cost. e.g., 10 for 10%]
[Enter the fixed tariff for BESS (in Currency of Choice/MW/Month).]
[Enter the tariff for BESS (in Currency of Choice/MWh).]
[Enter the annual depreciation rate. e.g., 5 for 5%]
[Enter the number of years for the Written Down Value (WDV) method.]
[Enter the total O&M cost for the first year of operation.]
[Enter O&M cost as a percentage of the total Capex. e.g., 1 for 1%]
[e.g., 10 for 10%]
[e.g., 2 for 2%]
[e.g., 5 for 5%]
[e.g., 2.33 for 70% debt, 30% equity]
[e.g., 1 for 1%]
[e.g., 25 for 25%]
[Enter the rate of yearly degradation, e.g., 2 for 2%]
[Enter the number of BESS operation cycles per day.]
[Enter the value of round trip efficiency, e.g., 85 for 85%]
[Enter the desired rate of return for equity investors. e.g., 12 for 12%]
[e.g., 1.2]
[e.g., 7 for 7%]